8th Terrace Street Closure for Construction, Sept. 5

The City of Coos Bay contracted with Johnson Rock Products Inc. to perform the replacement of the sanitary sewer line located along 8th Terrace. Construction work will begin Tuesday, September 4th.  For safety, reasons, this work will require a full road closure with access to local residents for the next few weeks. Traffic will be detoured around the work zone between the hours 7:00 am until 6:00 pm, Monday through Friday. There will be no on street parking in this portion of 8th Terrace while the replacement is underway. Drivers and pedestrians are advised to please exercise caution within the construction zone and detour area. The contractor will work with the affected home owners as needed. Any questions can be directed to Public Works Engineering Division at 541-269-8918.