I-5 Motorists be Advised, Dec. 9

The replacement of a variable message board on northbound Interstate 5 at Lake Creek Road (milepost 214) in the mid Willamette Valley will cause evening delays during December 9-10. To safely remove the old board and install the new one, there will need to be evening lane closures. The work is scheduled from 9 p.m. to 5 a.m. each evening on December 9 and 10. One lane will remain open during the work. In addition, there will be evening rolling traffic slowdowns starting at the Randy Pape Beltline (OR 569) in Eugene. Travelers should expect delays.  Travelers are encouraged to visit TripCheck.com for the very latest on traffic conditions.