COOS COUNTY – U.S. 101 (Oregon Coast Highway), MP 234, McCullough Bridge painting ($31.4 million) – This project will paint the steel truss section of McCullough Bridge, replace rivets, remove rust and repair damaged steel. Construction is scheduled for completion in fall 2021. For more information, visit: www.McCulloughBridge.com. The project is in winter shutdown. Workers may perform minor work from the sidewalks, but no traffic impacts are expected. The northbound sidewalk will remained closed throughout the winter, and access for pedestrians will be maintained via the southbound sidewalk. Work is expected to resume in spring 2020. OREGON 241 (Coos River Highway), MP 0.5, Isthmus Slough Bridge rehabilitation project ($7.9 million) – Watch for intermittent lane closures and brief delays. Flaggers will provide traffic control as needed. For more information, visit: www.IsthmusSloughBridge.com. OREGON 542 (Powers Highway), MP 0-18, Warning sign upgrades. Watch for intermittent lane closures along Powers Highway as workers install and replace warning signs. CURRY COUNTY – U.S. 101 (Oregon Coast Highway), MP 328, Isaac Lee Patterson (Rogue River) Bridge repair ($3.3 million). This project will provide several repairs to the U.S. 101 Rogue River Bridge at the north end of Gold Beach. Construction is scheduled from January to November 2020. Watch for intermittent weeknight (Sunday night to Friday morning, 7 p.m. to 7 a.m.) single-lane closures on the bridge. Motorists should expect delays up to 20 minutes. Flaggers will provide traffic control as needed.