Variable Message Boards on I-5, Nov. 18

The replacement of variable message boards/signs at three locations on Interstate 5 in the mid Willamette Valley will cause evening delays over the next two weeks. To safely remove the old boards and install the new ones, there will need to be evening lane closures. The work is scheduled as follows: Southbound I-5 at Arndt Road, milepost 281 – The variable message board/sign will be replaced on Sunday-Tuesday, November 17-19 from 9 p.m. to 5 a.m. each evening. At least one lane will remain open during the work. Travelers should expect delays. Northbound I-5 at Perkins Road, milepost 262. The variable message board/sign will be replaced on Wednesday-Thursday, November 20-21 from 9 p.m. to 5 a.m. each evening. At least one lane will remain open during the work. Travelers should expect delays. Northbound at Lake Creek, milepost 214 – The variable message board/sign will be replaced on Sunday-Wednesday, November 24-27 from 9 p.m. to 5 a.m. each evening. One lane will remain open during the work. In addition, there will be evening rolling traffic slowdowns starting at the Randy Pape Beltline (OR 569) in Eugene. Travelers should expect delays. Travelers are encouraged to visit TripCheck.com for the very latest on traffic conditions.